• Plastic Extruder Machnie Pet Strap Band Production Line
  • Plastic Extruder Machnie Pet Strap Band Production Line
  • Plastic Extruder Machnie Pet Strap Band Production Line
  • Plastic Extruder Machnie Pet Strap Band Production Line

Plastic Extruder Machnie Pet Strap Band Production Line

Type: Sheet Extruder
Plastic Processed: Pet
Product Type: Extrusion Molding Machine
Feeding Mode: One Feed
Assembly Structure: Integral Type Extruder
Screw: Twin-Screw
Customization:

Contact Supplier

Diamond Member Since 2009

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
weier-50/40
Engagement System
Full Intermeshing
Screw Channel Structure
Deep Screw
Exhaust
Exhaust
Automation
Automatic
Computerized
Computerized
Colour
Customers Requirement
Max Output
80-300kg/Hr
Line Speed
120m/Min
Draw Ratio
4-6
Transport Package
as Per Export Standard
Specification
10T
Trademark
WEIER
Origin
Qingdao, China
HS Code
84472090
Production Capacity
100/Year

Product Description

WEIER-50/40 PET straps band production line

Product Description
PET strapping machine,using the recycling bottle slices as raw materials by making them melt directly,which reduces the course of raw material-making.Low energy consumption, high production capability.Easy to operate ,save manpower. It can use sigle screw or double screw accordingto your requirement. It can use 100% recycling material. Measurement pump ensure consecutive and stable production. Two pole four station filter can effciently elimimate Iimpurity. Large hualing force stretch device and insulation oven. 
We can according to your requirement to customrized product.



Summary

Processing material

100% recycled PET flakes or virgin PET

Product width

9-32mm

Strap thickness

0.5-1.3mm

Quantity of extruded

1 or 2 pieces

Output max.

100kg/h

Max liner speed

100m/min × 2

Power supply

as per customer's 400V,3P,50HZ

Installed power

270KW(consumption power: about 180KW)

operator

2-3 worker/shift

overall dimension

33m×3.0m×4.5m



Equipment list
 

Item Name QTY
1 Auto feeding system One set
2 PET dryness &dehumidification &crystallization unit One set
3 WER-50/40 twin screw extruder One set
4 Hydraulic rapid screen changer One set
5 Gear pump One set
6 Mould for one strap One set
7 Cooling roller(include high static generator and water chiller) One set
8 the first pre-heating unit One set
9 Quartz pipe heating oven One set
10 First stretching unit One set
11 Second stretching unit One set
12 Embossing unit One set
13 Thermo-setting One set
14 3-roller hauling off One set
15 Cooling trough One set
16 Blower One set
17 3-roller hauling off One set
18 double-position winder One set
 


Production Picture

PET Strap Band
Plastic Extruder Machnie Pet Strap Band Production Line
                 Main Engine                                   Recoiling Machine and Curling Machine                   Cooling Trough                          
Plastic Extruder Machnie Pet Strap Band Production Line         Plastic Extruder Machnie Pet Strap Band Production Line        Plastic Extruder Machnie Pet Strap Band Production Line         

FAQ
Q1.How to pay to you?
A:1)30% of total amount paid by TT as advance, then the seller start production 
2)after the machine is finished ,buyer come to test the machine in seller's factory , 
and then pay the 70% balance by TT or irrevocable L/C at sight . Then seller ship the machine.
Q2.How long is the delivery time?
A: For standard machines, it would be 30 days; For non-standard machines and customized machines according 
to client s specific requirements,  it would be 45 days. 
Q3.Do you arrange shipment for the machines?
A:Yes,for FOB or CIF price, we will arrange shipment for you.
Q4.How about the documents after shipment? 
After shipment, we ll send all original documents to you by DHL, including Packing List,  
Commercial Invoice, B/L, and other certificates as required by clients.
Q5.What's your after-sales service ?
(1)The supplier provides service manual and maintenance instruction of main electric appliances, limb, usage manual of equipment. We also supply water, electricity, gas of equipment and installation drawing. (2)The supplier is responsible for installation, debugging and training, but the air tickets, insurance, eating, housing and every day 50 USD for each engineer will be born by the buyers. We will realize guarantee of repair; replacement and refund of substandard products within one year after the machine leaves factory. And half a year for electric parts. Fittings of the machine will be supplied at preferential price after one year.
Q6.What's your warranty?
We will realize guarantee of repair; replacement and refund of substandard products within one year after the machine arrived in customer's factory (except destroyed by buyers' wrong operation). We guarantee the material of screw & barrel (guarantee without normal abrasion). And half a year for electric parts. Fittings of the machine will supply at preferential price after one year. 





 

Send your message to this supplier

*From:
*To:
avatar Ms. Echo Lee
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now