Customization: | Available |
---|---|
Type: | Sheet Extruder |
Plastic Processed: | PVC ASA PMMA |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Raw material & formulation | PVC resin, Caco3, lubricant,stabilizing agent, pigment, anti-ultraviolet agent,Pigment etc |
Central height: | 1000mm |
Max. Haul-off speed: | 3m/min |
Operation direction | From right to left (face to the operation panel) |
Machine color | Standard color: RAL7016 (Anthracite grey) ; RAL9002 (Grey white) |
Description final product & Output capacity | Singlelayers PVC Roofing tile; Width:500-1500mm,Thickness: 1.2~3.0mm; Wave distance:180mm; Wave height:30mm; Output:300-400kg/h(Depending on CaCO3 proportion) |
Warehouse/Workshop | Construction of foundations, construction works, earthworks, and wall works; Supply of cranes, fork-lifts or other lifting equipment; Mounting materials and tools; Dimension (M×M×M): 20 (Length)×2.0 (width) ×2.5 (Height) Crane: Machine positioning |
Temperature & Humidity | ≤40°C, ≤95% |
Power supply | Supply voltage: 3*380V+N+PE; Voltage tolerance: +5%/-5%; Control voltage: 24VDC+220VAC; Frequency: 50HZ+-2% |
Wire/cables/water hose: | Wires/cables: from power supply to control cabinet of this production line and all electrical cables from control cabinet to each machine; Water hose: supply water to machines and pools; |
Cooling Water | Without dissolved or suspended minerals as phosphor, sulphur, iron, etc. Inflow temperature T1: max. 15°C; Outflow temperature T2: T2=T1+5°C; Hardness: 5-8 OdH; Reflux: without pressure |
Lubrication oil: | Sinopec, Exxon mobile |
Compressor | Unnecessary |
Installation power | 135KW,the real consumption only 80% |
Cooling Water | ≤20°C, ≥0.3Mpa, ~4-5tons/hr |
Compressedair | 0.3m3/min, >0.6Mpa |
Manpower | 2-3 Person |
Project | PVC roofing tile extrusion line |
Payment term | 30% as down payment by T/T; 70% by T/T before delivery and after inspection |
Delivery time | 70 days since the date of receiving down payment |
Packing | Wood pallet covered by plastic film |
Warranty period | 13 months since date of bill of lading |
Technology service | the supplier provide service manual and maintenance instruction of main electric appliance ,limb , usage manual of equipment, We also supply water,electricity,gas of equipment and installation drawing. |
After-sale service | the supplier is responsible for installation,debug and training, we will realize guarantee of repair; replacement of substandard products within one year. After the machine leaves factory. Fittings of the machine will supply at preferential price after one year . |
Debugging | The seller will send one or two technician to the buyer'plant to debugging, and the tickets ,eating ,transportation and visa fee will be paid by the buyer , also including 50USD salary/person /day |