Customization: | Available |
---|---|
Warranty: | Provide |
Product Type: | PE Pipe |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Raw material preparation→ vacuum feeding machine → hopper dryer → single screw extruder → color code extruder → mould and calibrator → vacuum forming machine → cooling tank → haul-off machine → cutting machine → discharging rack.→ electrical control system
Brand Name | Weier |
Model number | GMC 75/33 |
Suitble resin | HDPE resin |
Line speed | 1-27m/min |
Output | 180-200Kg/h |
Total power | 130KW |
Power supply | 380V 3P 50Hz |
Delivery detail | 55 days |
Center height | 1000±50mm |
After-sales service provided | Engineers available to service machinery overseas |
1 | automatic feeding system |
2 | raw material drying system |
3 | SJ65/33 high efficiency single screw extruder |
4 | SJ25/25 single screw extruder ( for mark line) |
5 | mold(including mouth mold, mandril, sizing sleeve, heating circle) |
6 | PE pipe sizing sleeves ( 63-160mm) |
7 | Vacuum sizing tank |
8 | Sprinkling cooling water tank |
9 | Three haul off machine |
10 | Planetary dustless high speed cutter |
11 | Three position winder for 63-160mm HDPE water pipe |
Or reversal stacker | |
12 | Electrical control system |
Q1: How to visit our Factory? (not a trade company)
A:Qingdao Airport → Pick you up
Q2: How does your factory do the quality control?
A:"QUALITY FIRST " We purchase qualified parts, test the machine every step when manufacturing.
Q3: How about the installation?
A: Option 1: Our engineer installs the machines for you, also train your staff until they can run the machine independently.
Option 2: You learn installation in our factory.
Q4: Do you have after-sale service?
A: The supplier is responsible for installation, debugand training, we will realize guarantee of repair; Replacement and refund of substandard products within one year after the machine leaves factory. Fittings of the machine will supply at preferential price after one year
Q5: How about the payment term?
A:30% deposit, 70% after testing machine in our factory Before Shipping By T/T, VISA,L/C.