Customization: | Available |
---|---|
After-sales Service: | Motor/PLC |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The production line consists of conical twin screw extruder, vacuum tank, haul-off, cuttting unit. Main features: High output, power comsumption low, water comsumption low, ground cover small, labour cost low, noise low, dust less, etc.
Main Features:
Specified screw design for better material plasticizing&mixing effect and lower cost formula.
Higher density and stronger mechanical properties of the pipe as a result of large compression ratio of mold design.
More stable and reliable hauling, no deformation, multi-caterpillar structure of haul-off unit, suitable for different size range.
Planetary cutting with chamfering function for stable&reliable cutting and precise length-counting.
Main technical parameters
Model |
Pipe range/mm |
Capacity kg/h
|
Maximum linear velocity |
Main motor power /kw
|
Total length/m |
SJSZ-65/132 |
50-110 |
120-250
|
6 |
37
|
22 |
SJSZ-80/156 |
110-250 |
250-400
|
5 |
75
|
23 |
SJSZ-92/188 |
315-630 |
400-700
|
1.5 |
110
|
32 |
PVC Double-Pipe Production Line
Model |
Pipe Diameter |
Output |
Max Speed |
Motor |
Total Length |
SJSZ-65/132 |
50-75mm |
250-350 kg/h |
6m/min*2 |
30kw |
22m |
SJSZ-80/156 |
50-110mm |
500-750kg/h |
8m/min*2 |
55kw |
23m |
PVC Four-Pipe Production Line
Model |
Pipe Diameter |
Output |
Max Speed |
Motor Power |
Total Length |
SJSZ-65/132 |
16-32mm |
250-350kg/h |
15m/min*4 |
30kw |
17m |
1. Product electrical components to implement quality assurance for six months (from date of shipment)
2. Equipment Quality Assurance warranty period of one year (from date of shipment)
3. Quality guarantee period, should the damage appears artificial parts, the company will be provided free of charge to the purchaser Manufacturers
4. Quality guarantee period, the company will provide the most preferential prices paid to the purchaser Manufacturers
5. "Supply-side free of charge to provide the main electrical appliances, spare parts manual and maintenance of books, equipment manuals, and machine maintenance information, provision of equipment, water, electricity, gas and equipment installation plans.
6. For the party responsible for assisting in installation, commissioning and training services, equipment, three bags of one year after leaving the factory, three bags of equipment, one year after the supply of spare parts according to price. "